VR2-0254
① SA Source
- Source: 開啟完整 SA 文章
- Section:
Power Delivery - Line hint:
337
Context Before
Power Delivery
The power delivery module sits above the BlueField-4 module. The module receives 50V power from the internal busbar cable. Then the current is stepped down to 12V with a modular power brick. Then, 12V current is delivered to the Orchid module, the BlueField-4 module, the management modules via smaller internal busbars.
Evidence
Context After
System Management
The management module is made up of multiple smaller management modules that fall under this category. These modules occupy a long slim space between the BlueField-4 module and the right-side Orchid modules. The management modules are the following:
② Atomic Claim
VR NVL72 Component BoM and Power Budget Model 中也涵蓋 rack 其餘元件。
- Epistemic Mode:
ASSERTED - Mapping Status:
PARTIAL
③ Semantic Frame
{
"attribute": "UNSPECIFIED_ATTRIBUTE",
"context_nodes": [],
"entity": {
"id": "04_knowledge_base/VR NVL72",
"label": "VR NVL72"
},
"frame_type": "ATTRIBUTE",
"qualifiers": {
"condition_text": null,
"numeric_mentions": [],
"temporal_mentions": []
},
"value": {
"numeric_mentions": [],
"value_text": "VR NVL72 Component BoM and Power Budget Model 中也涵蓋 rack 其餘元件。"
}
}④ Canonical Entity Mapping
| Role | Surface Label | Canonical Target |
|---|---|---|
| entity | VR NVL72 | 04_knowledge_base/VR NVL72 |
⑤ Human Review
請在 Properties 逐項確認:
- 原文 → Atomic Claim 是否忠實
- Atomic Claim → Semantic Frame 是否忠實
- Canonical Entity mapping 是否正確
- Epistemic mode 是否保留原文語氣
- 最後選擇
review_action
Review state
Markdown 內文不是正式 approval。只有 Apply bridge 寫入的 Decision Ledger event 才是正式決策。