VR2-0419
① SA Source
- Source: 開啟完整 SA 文章
- Section:
Compute Tray: Power Delivery - Line hint:
513
Context Before
Previously, cold plates were assembled at the L10 assembly level where the various components are put into place in the chassis. Given the modular approach, the cold plates need to be more tightly integrated with the module itself. Hence, the cold plate will be attached at the L6 assembly level right after the PCBA process. This increases the assembly efficiency as the assembly at L10 is simplified to slotting in the completed modules into the corresponding connectors and quick disconnects.
Compute Tray: Power Delivery
Evidence
Then power travels to the middle of the chassis via the internal busbar cables
Context After

Source: Nvidia VR NVL72 Component BoM and Power Budget Model ↗
② Atomic Claim
接著 power 透過 internal busbar cables 傳到 chassis 中央。
- Epistemic Mode:
ASSERTED - Mapping Status:
PARTIAL
③ Semantic Frame
{
"attribute": "UNSPECIFIED_ATTRIBUTE",
"context_nodes": [],
"entity": {
"id": "04_knowledge_base/Busbar",
"label": "busbar"
},
"frame_type": "ATTRIBUTE",
"qualifiers": {
"condition_text": null,
"numeric_mentions": [],
"temporal_mentions": []
},
"value": {
"numeric_mentions": [],
"value_text": "接著 power 透過 internal busbar cables 傳到 chassis 中央。"
}
}④ Canonical Entity Mapping
| Role | Surface Label | Canonical Target |
|---|---|---|
| entity | busbar | Busbar |
⑤ Human Review
請在 Properties 逐項確認:
- 原文 → Atomic Claim 是否忠實
- Atomic Claim → Semantic Frame 是否忠實
- Canonical Entity mapping 是否正確
- Epistemic mode 是否保留原文語氣
- 最後選擇
review_action
Review state
Markdown 內文不是正式 approval。只有 Apply bridge 寫入的 Decision Ledger event 才是正式決策。