VR2-0531
① SA Source
- Source: 開啟完整 SA 文章
- Section:
Rack Level Infrastructure: Power Delivery - Line hint:
615
Context Before

Source: TE Connectivity, OCP 2025
Evidence
Below we provide two possible scenarios of the power rack deployment for VR NVL72
Context After

Source: Nvidia VR NVL72 Component BoM and Power Budget Model ↗
② Atomic Claim
文章提出兩種 VR NVL72 power rack 可能的部署情境。
- Epistemic Mode:
HYPOTHETICAL - Mapping Status:
PARTIAL
③ Semantic Frame
{
"attribute": "UNSPECIFIED_ATTRIBUTE",
"context_nodes": [],
"entity": {
"id": "04_knowledge_base/VR NVL72",
"label": "VR NVL72"
},
"frame_type": "ATTRIBUTE",
"qualifiers": {
"condition_text": null,
"numeric_mentions": [],
"temporal_mentions": []
},
"value": {
"numeric_mentions": [],
"value_text": "文章提出兩種 VR NVL72 power rack 可能的部署情境。"
}
}④ Canonical Entity Mapping
| Role | Surface Label | Canonical Target |
|---|---|---|
| entity | VR NVL72 | 04_knowledge_base/VR NVL72 |
⑤ Human Review
請在 Properties 逐項確認:
- 原文 → Atomic Claim 是否忠實
- Atomic Claim → Semantic Frame 是否忠實
- Canonical Entity mapping 是否正確
- Epistemic mode 是否保留原文語氣
- 最後選擇
review_action
Review state
Markdown 內文不是正式 approval。只有 Apply bridge 寫入的 Decision Ledger event 才是正式決策。