SA260324R-0227
① SA Source
- Source: 開啟完整 SA 文章
- Section:
Oberon and Kyber Updates, Larger World Sizes Introduced, More Networking Updates - Line hint:
282
Context Before
Each switch blade is also double in height vs the GTC 2025 prototype, with 6 NVLink 7 switches per switch blade, and 12 switch blades per rack, amounting to a total of 72 NVLink 7 switches per Kyber rack.
Evidence
Context After
Kyber midplane PCB (GPU side). Source: Nvidia, SemiAnalysis
② Atomic Claim
GPU 會以 all-to-all 方式連到 switch blade,透過 2 個 PCB midplane,或等價地每個 canister 1 個 midplane。
- Epistemic Mode:
ASSERTED - Mapping Status:
PARTIAL
③ Semantic Frame
{
"frame_type": "NARY_RELATION",
"participants": [
{
"node": {
"id": "04_knowledge_base/GPU",
"label": "GPU"
},
"role": "compute_device"
},
{
"node": {
"id": "04_knowledge_base/PCB",
"label": "PCB"
},
"role": "board"
},
{
"node": {
"id": "04_knowledge_base/Midplane",
"label": "midplane"
},
"role": "midplane"
}
],
"qualifiers": {
"condition_text": "switch blade 與 canister 沒有 canonical entity",
"numeric_mentions": [
"2",
"1"
],
"temporal_mentions": []
},
"relation_type": "GPU_TO_SWITCH_BLADE_MIDPLANE_CONNECTIVITY"
}④ Canonical Entity Mapping
⑤ Human Review
請在 Properties 逐項確認:
- 原文 → Atomic Claim 是否忠實
- Atomic Claim → Semantic Frame 是否忠實
- Canonical Entity mapping 是否正確
- Epistemic mode 是否保留原文語氣
- 最後選擇
review_action
Review state
Markdown 內文不是正式 approval。只有 Apply bridge 寫入的 Decision Ledger event 才是正式決策。