VR2R-0690
① SA Source
- Source: 開啟完整 SA 文章
- Section:
Assembly Automation and Logistics - Line hint:
595
Context Before
Although not as efficient, compute tray assembly without automation should be much easier compared to Blackwell as well given the seamless modular design.
Evidence
Then at L11, the various ODMs/OEMs assemble the compute tray into the rack.
Context After
② Atomic Claim
接著在 L11 階段,各 ODM / OEM 會把 compute tray 組裝進 rack。
- Epistemic Mode:
ASSERTED - Mapping Status:
PARTIAL
③ Semantic Frame
{
"attribute": "L11_RACK_ASSEMBLY_STAGE",
"context_nodes": [],
"entity": {
"id": "04_knowledge_base/Compute Tray",
"label": "compute tray"
},
"frame_type": "ATTRIBUTE",
"qualifiers": {
"condition_text": "ODM/OEM and rack are plain text",
"numeric_mentions": [
"L11"
],
"temporal_mentions": []
},
"value": {
"numeric_mentions": [
"L11"
],
"value_text": "At L11, ODMs/OEMs assemble the compute tray into the rack."
}
}④ Canonical Entity Mapping
| Role | Surface Label | Canonical Target |
|---|---|---|
| entity | compute tray | 04_knowledge_base/Compute Tray |
⑤ Human Review
請在 Properties 逐項確認:
- 原文 → Atomic Claim 是否忠實
- Atomic Claim → Semantic Frame 是否忠實
- Canonical Entity mapping 是否正確
- Epistemic mode 是否保留原文語氣
- 最後選擇
review_action
Review state
Markdown 內文不是正式 approval。只有 Apply bridge 寫入的 Decision Ledger event 才是正式決策。