VR2R-0632
① SA Source
- Source: 開啟完整 SA 文章
- Section:
Ethernet-Based Cluster Deployments - Line hint:
542
Context Before
Increased overall network reliability is another compelling point. Transceivers can be unreliable, with a large cluster certain to have ongoing link flaps.
Evidence
Context After
It is an encouraging start—but we think this point could get stronger with more in-field test deployments.
② Atomic Claim
Meta 在 ECOC 發表的研究顯示,經過 1,500 萬個 400G port-device hours 測試後,CPO 顯示出良好的可靠性;這約等同於 15 台 CPO switches 在實驗室中測試 11 個月。
- Epistemic Mode:
ASSERTED - Mapping Status:
COMPLETE
③ Semantic Frame
{
"frame_type": "NARY_RELATION",
"participants": [
{
"node": {
"id": "02_companies/META",
"label": "Meta"
},
"role": "study_owner"
},
{
"node": {
"id": "04_knowledge_base/CPO",
"label": "CPO"
},
"role": "technology"
}
],
"qualifiers": {
"condition_text": "study presented at ECOC; lab-equivalent exposure comparison",
"numeric_mentions": [
"15M",
"400G",
"15",
"11 months"
],
"temporal_mentions": [
"11 months"
]
},
"relation_type": "META_STUDY_REPORTS_CPO_RELIABILITY_TEST_RESULTS"
}④ Canonical Entity Mapping
⑤ Human Review
請在 Properties 逐項確認:
- 原文 → Atomic Claim 是否忠實
- Atomic Claim → Semantic Frame 是否忠實
- Canonical Entity mapping 是否正確
- Epistemic mode 是否保留原文語氣
- 最後選擇
review_action
Review state
Markdown 內文不是正式 approval。只有 Apply bridge 寫入的 Decision Ledger event 才是正式決策。