VR2R-0464
① SA Source
- Source: 開啟完整 SA 文章
- Section:
Procurement and Cooling Vendor Implications - Line hint:
388
Context Before
Today, in-row CDUs offer cooling capacities up to roughly 2 MW, but
Evidence
we expect future facility CDUs to reach 3-6 MW.
Context After
Delta currently leads in the CDU specialist segment, alongside Schneider Electric, Vertiv, and nVent. Foxconn and Quanta dominate the system integrator category.
② Atomic Claim
SemiAnalysis 預期未來 facility CDU capacity 將達 3–6MW。
- Epistemic Mode:
EXPECTED - Mapping Status:
COMPLETE
③ Semantic Frame
{
"attribute": "EXPECTED_FUTURE_CAPACITY",
"context_nodes": [],
"entity": {
"id": "04_knowledge_base/Coolant Distribution Unit (CDU)",
"label": "CDU"
},
"frame_type": "ATTRIBUTE",
"qualifiers": {
"condition_text": "SemiAnalysis expectation",
"numeric_mentions": [
"3MW",
"6MW"
],
"temporal_mentions": [
"未來"
]
},
"value": {
"numeric_mentions": [
"3MW",
"6MW"
],
"value_text": "future facility CDUs are expected to reach 3-6 MW."
}
}④ Canonical Entity Mapping
| Role | Surface Label | Canonical Target |
|---|---|---|
| entity | CDU | 04_knowledge_base/Coolant Distribution Unit (CDU) |
⑤ Human Review
請在 Properties 逐項確認:
- 原文 → Atomic Claim 是否忠實
- Atomic Claim → Semantic Frame 是否忠實
- Canonical Entity mapping 是否正確
- Epistemic mode 是否保留原文語氣
- 最後選擇
review_action
Review state
Markdown 內文不是正式 approval。只有 Apply bridge 寫入的 Decision Ledger event 才是正式決策。