VR2R-0461
① SA Source
- Source: 開啟完整 SA 文章
- Section:
Procurement and Cooling Vendor Implications - Line hint:
386
Context Before
The primary vendor implication of the updated cooling architecture and doubled power density relates to CDUs and the rack-to-CDU ratio. Today, a CDU can support around 10 GB200 racks. With a rack generating about 2x the heat, that ratio would need to decline unless CDU capacity increases, implying either more CDUs or higher-capacity CDUs.
Evidence
We believe most major operators expect to maintain a ratio of around 10 racks per CDU.
Context After
As rack power density rises, this points to larger CDUs.
② Atomic Claim
SemiAnalysis 認為,多數 major operators 預期維持約 10 racks/CDU 的比例。
- Epistemic Mode:
EXPECTED - Mapping Status:
COMPLETE
③ Semantic Frame
{
"attribute": "EXPECTED_RACK_TO_CDU_RATIO",
"context_nodes": [],
"entity": {
"id": "04_knowledge_base/Coolant Distribution Unit (CDU)",
"label": "CDU"
},
"frame_type": "ATTRIBUTE",
"qualifiers": {
"condition_text": "SemiAnalysis expectation",
"numeric_mentions": [
"10"
],
"temporal_mentions": []
},
"value": {
"numeric_mentions": [
"10"
],
"value_text": "most major operators are expected to maintain around 10 racks per CDU."
}
}④ Canonical Entity Mapping
| Role | Surface Label | Canonical Target |
|---|---|---|
| entity | CDU | 04_knowledge_base/Coolant Distribution Unit (CDU) |
⑤ Human Review
請在 Properties 逐項確認:
- 原文 → Atomic Claim 是否忠實
- Atomic Claim → Semantic Frame 是否忠實
- Canonical Entity mapping 是否正確
- Epistemic mode 是否保留原文語氣
- 最後選擇
review_action
Review state
Markdown 內文不是正式 approval。只有 Apply bridge 寫入的 Decision Ledger event 才是正式決策。