VR2R-0414

① SA Source

Context Before

For the modules at the front of chassis—CX-9, BlueField-4, and management—the PDB feeds 12VDC of power to each of the modules.

Evidence

50VDC is stepped down to 12VDC at the PDB then, via a copper busbar device, the PDB feeds 12VDC to its neighboring modules.

Context After

The power connector of CX-9 is located near the Paladin HD2 at the top of the modules.

② Atomic Claim

PDB 先將 50VDC 降至 12VDC,再透過 copper busbar device,向鄰近 modules 供應 12VDC。

  • Epistemic Mode: ASSERTED
  • Mapping Status: PARTIAL

③ Semantic Frame

{
  "attribute": "PDB_12V_DISTRIBUTION_PATH",
  "context_nodes": [],
  "entity": {
    "id": "04_knowledge_base/Busbar",
    "label": "busbar"
  },
  "frame_type": "ATTRIBUTE",
  "qualifiers": {
    "condition_text": "PDB is plain text in source claim",
    "numeric_mentions": [
      "50VDC",
      "12VDC"
    ],
    "temporal_mentions": []
  },
  "value": {
    "numeric_mentions": [
      "50VDC",
      "12VDC"
    ],
    "value_text": "PDB steps 50VDC down to 12VDC and distributes 12VDC via a copper busbar device."
  }
}

④ Canonical Entity Mapping

RoleSurface LabelCanonical Target
entitybusbarBusbar

⑤ Human Review

請在 Properties 逐項確認:

  • 原文 → Atomic Claim 是否忠實
  • Atomic Claim → Semantic Frame 是否忠實
  • Canonical Entity mapping 是否正確
  • Epistemic mode 是否保留原文語氣
  • 最後選擇 review_action

Review state

Markdown 內文不是正式 approval。只有 Apply bridge 寫入的 Decision Ledger event 才是正式決策。