VR2R-0288

① SA Source

  • Source: 開啟完整 SA 文章
  • Section: Replacing Internal Cables with Board-to-Board Connectors
  • Line hint: 254

Context Before

Although a cableless design might initially appear unfavorable for Amphenol, it is in fact a positive. Signals between the Strata module and the daughter modules still need a physical interconnect.

Evidence

In this architecture, those signals exit the Strata board through Amphenol’s PaladinHD2 board-to-board connectors.

Context After

The signal is then routed through a PCB midplane sitting in the middle of the chassis.

② Atomic Claim

在這個 architecture 中,signals 會從 Strata board 經由 Amphenol 的 PaladinHD2 board-to-board connectors 離開。

  • Epistemic Mode: ASSERTED
  • Mapping Status: COMPLETE

③ Semantic Frame

{
  "frame_type": "NARY_RELATION",
  "participants": [
    {
      "node": {
        "id": "04_knowledge_base/NVIDIA Strata Board",
        "label": "Strata board"
      },
      "role": "source_module"
    },
    {
      "node": {
        "id": "04_knowledge_base/Paladin connector",
        "label": "PaladinHD2"
      },
      "role": "connector"
    },
    {
      "node": {
        "id": "04_knowledge_base/Board-to-board connectors",
        "label": "board-to-board connectors"
      },
      "role": "connector_type"
    }
  ],
  "qualifiers": {
    "condition_text": "Amphenol is plain text in source claim",
    "numeric_mentions": [],
    "temporal_mentions": []
  },
  "relation_type": "STRATA_SIGNALS_EXIT_VIA_PALADIN_B2B_CONNECTORS"
}

④ Canonical Entity Mapping

RoleSurface LabelCanonical Target
source_moduleStrata board04_knowledge_base/NVIDIA Strata Board
connectorPaladinHD204_knowledge_base/Paladin connector
connector_typeboard-to-board connectors04_knowledge_base/Board-to-board connectors

⑤ Human Review

請在 Properties 逐項確認:

  • 原文 → Atomic Claim 是否忠實
  • Atomic Claim → Semantic Frame 是否忠實
  • Canonical Entity mapping 是否正確
  • Epistemic mode 是否保留原文語氣
  • 最後選擇 review_action

Review state

Markdown 內文不是正式 approval。只有 Apply bridge 寫入的 Decision Ledger event 才是正式決策。